Liebherr Australia
Prefab Drop-in Pit fitted with Lubrication & Diagnostic Equipment
Installed at their Erskine Park, NSW complex, Liebher’s workshop facility included a prefabricated drop in pit with a fully equipped with heavy duty jacking system, roller brake testers & suspension/play detectors.
To utilise their existing space and utilities mains, we installed a self service wash bay directly pit-side with add grate drain and pit safety covers. A unique solution.
Client | Liebherr Australia Pty Ltd |
---|---|
Location | Erskine Park, NSW |
Details | Prefabricated Drop-in Pit & Diagnostic Equipment |