Integral Energy, Kings Park NSW

Finkbeiner 4 Post Hoist Conversion

To utilise their existing space and 4 post hoist, Hartex created a solution that used Finkbiener column hoists to create a 4 post hoist. Drive on platforms were manufactured locally by us at our Sydney plant.

A majorlift jacking beam was fitted to the Finkbeiner 4 post hoist for extra lifting capacity.

Client Integral Energy
Location Kings Park, NSW
Details 4 Post Hoist Hoist Finkbiener Conversion